The City of Stonnington is restoring Prahran Market. The market building and infrastructure was the subject of detailed building condition audits which identified a number of items in need of remediation and repair.

Responding to the findings of the building condition audits we have completed further investigations and developed a remediation plan that over a three to four year program of works will see this iconic landmark and shopping destination returned to its best.

The Market restoration works commenced in early-2023 and will be delivered progressively over a number of stages.

We recognise works of this nature will cause some inconvenience. Every effort will be made to keep disruption to a minimum.

Current works

Project status In progress
Project type Gas meter room upgrade
Scope of works

Upgrade gas meter room to current standards

Construction timeline

August 2024 to November 2025

Contact

City of Stonnington

Project Manager

Reza Ramjerdi

E: rramjerd@stonnington.vic.gov.au

P: 8290 6079


Emergency

P: 8290 1333 (all hours)


Project status In progress
Project type Stormwater and flooring upgrade (Stage 3)
Scope of works

Repair stormwater system

Install new flooring

Construction timeline

February to August 2025 (estimated)

Contact

City of Stonnington

Project Manager

Reza Ramjerdi

E: rramjerd@stonnington.vic.gov.au

P: 8290 6079


Emergency

P: 8290 1333 (all hours)


Project status In progress
Project type Switchboard upgrades
Scope of works

Upgrade electrical switchboards to current standards

Construction timeline

August 2024 to June 2025

Contact

City of Stonnington

Project Manager

Reza Ramjerdi

E: rramjerd@stonnington.vic.gov.au

P: 8290 6079


Emergency

P: 8290 1333 (all hours)


Project status In progress
Project type Disability access improvement
Scope of works

Improve access to current standards

Construction timeline

July 2024 to June 2026

Contact

City of Stonnington

Project Manager

Reza Ramjerdi

E: rramjerd@stonnington.vic.gov.au

P: 8290 6079


Emergency

P: 8290 1333 (all hours)

Future works

Project type  Harvest Hall roof restoration
Timeline TBA 
Scope of works

Repair roof over Harvest Hall


Project type  Stormwater and flooring upgrade (Stage 4)
Timeline TBA 
Scope of works

Repair stormwater system

Install new floording

Completed works

Project type Prahran Market renewal works
Completion date  September 2024 
Scope of works

Commercial Road building roof restoration

Erect scaffolding on Commercial Road and inside the Market

Replace existing roof slates

Repair damaged sections of roof structure

Repair doors and windows

Strengthen building structure

Repair and paint facade

Renew air conditioning system in the facade section of the building

Renew walkways within the roof space and upgrade roof

Substation upgrade

Expand and build substation room

Construct and install new switchboard room

Fire system upgrade

Install new dry fire system

Market Square roof upgrade

Structure remediation

Replace glass roof

Air conditioning system

Install new air conditioning system

Stormwater upgrade (Stages 1 and 2)

Maintenance and repair of stormwater system

Roof repair (Stage 1)

Repair roof above offices and tenancy

Project updates

The restoration of Prahran Market will be delivered over a number of stages.

Read the latest project updates for each stage of the works.

December 2023

Project Update #3 | Substation(PDF, 365KB)


July 2023

Project Update #2 | Facade and roof remediation(PDF, 272KB)


April 2023

Project Update #1 | Roof and facade works(PDF, 272KB)

 

  