Council has adopted a masterplan for the Harold Holt Swim Centre that will deliver restoration and improvement works to this popular facility over a number of years.

The implementation of the masterplan will occur over several stages and these works, together with an ongoing maintenance program, will ensure the facility continues to meet the requirements and expectations of visitors to the centre.


Current works

In 2024, we're upgrading the indoor change rooms, to deliver contemporary facilities that support our commitment to building and maintaining quality community assets.

The change rooms, that have come to the end of their useful life, will be fully upgraded with current fixtures and fittings removed and a full refit completed.

The works will be completed in stages to maintain the operation of the sauna and spa for as long as practical.

We recognise works of this nature will cause some inconvenience. Every effort will be made to keep disruption to a minimum and we thank you in advance for your patience and understanding.

Project Indoor change room upgrade 
Status  In progress 
Scope of works 

Demolish flooring, joinery, fixtures, lighting and toilets

Remove material from site

Install new joinery, flooring, finishes, lighting, fixtures and toilets

Reinstatement as required.

Construction timeline   August to November 2024
Hours of work 

7am to 5pm (Monday to Friday)

9am to 6pm (Saturday)

Contacts 

Contractor

Simbuilt Pty Ltd
Mitchell George
M: 0433 167 615


City of Stonnington

Senior Project Manager
Jessica Q Zhang
M: 0439 834 072


Emergency (all hours)

P: 8290 1333

Work zone 
HHSC - Notification_Work Site_Zoomed In.PNG
 
Latest news  August 2024 Project Notification #1(PDF, 116KB)

 

Completed works

Project

Heritage dive tower and pool restoration

Status 

Completed October 2022

Reopened 19 October 2022

Harold Holt dive pool back with a splash

Watch the works 
Scope of works 

Restore the heritage dive tower (with Heritage Victoria approved modifications)

Reconstruct dive tower spiral staircase and add security gate

Restore the dive pool

Install new 1-metre and 3-metre springboards to the dive pool

Demolish existing plant store, build new store north of the dive tower and install new plant

New paving, fencing and landscaping   

Community updates  15 October 2021 Resident Notification(PDF, 269KB)  
 Consultation

In 2019, community consultation was completed to determine the level of support for restoring the dive tower and pool.

View Harold Holt dive tower and pool consultation

Photo gallery   

Project Building Management System installation
Status Completed June 2021
Scope of works  Install BMS system to integrate all building operations (pool system, heating, cooling, lighting) into one central control system. 

Project
Boiler replacement
Status  Completed June 2021 
Scope of work 

Decommission and remove boiler

Install new condenser boiler

Commission


Project
Restore 50m outdoor pool 
Status  Complete December 2020 
Scope of works 

Drain 50m outdoor pool

Remove all tiles

Deep clean pool shell

Retile pool

Render pool walls

Refill and prepare pool for use

View the works 

Future works

Project 50-metre outdoor pool - accessible ramp 
Project  50-metre outdoor pool surrounds and grandstand - upgrade

  

 

 

Location

1409 High Street, Glen Iris 3146  View map

Google Map