Completed works

Project Indoor change room upgrade 
Status  Completed November 2024
Scope of works 

Demolish flooring, joinery, fixtures, lighting and toilets

Remove material from site

Install new joinery, flooring, finishes, lighting, fixtures and toilets

Reinstatement as required.

Work zone 
HHSC - Notification_Work Site_Zoomed In.PNG
 
Photo gallery   
Community updates  August 2024 Project Notification #1(PDF, 116KB)

Project

Heritage dive tower and pool restoration

Status 

Completed October 2022

Reopened 19 October 2022

Harold Holt dive pool back with a splash

Watch the works 
Scope of works 

Restore the heritage dive tower (with Heritage Victoria approved modifications)

Reconstruct dive tower spiral staircase and add security gate

Restore the dive pool

Install new 1-metre and 3-metre springboards to the dive pool

Demolish existing plant store, build new store north of the dive tower and install new plant

New paving, fencing and landscaping   

Community updates  15 October 2021 Resident Notification(PDF, 269KB)  
 Consultation

In 2019, community consultation was completed to determine the level of support for restoring the dive tower and pool.

View Harold Holt dive tower and pool consultation

Photo gallery   

Project Building Management System installation
Status Completed June 2021
Scope of works  Install BMS system to integrate all building operations (pool system, heating, cooling, lighting) into one central control system. 

Project
Boiler replacement
Status  Completed June 2021 
Scope of work 

Decommission and remove boiler

Install new condenser boiler

Commission


Project
Restore 50m outdoor pool 
Status  Complete December 2020 
Scope of works 

Drain 50m outdoor pool

Remove all tiles

Deep clean pool shell

Retile pool

Render pool walls

Refill and prepare pool for use

View the works 

Future works

Project 50-metre outdoor pool - accessible ramp 
Project  50-metre outdoor pool surrounds and grandstand - upgrade

  

 

 