In 2024, we engaged the talented team from Blender Studios to turn the two large walls at the north and south ends of the Malvern Valley shopping strip into works of art.
The collaborative effort led by artist Adrian Doyle has seen these large blank canvasses transformed into vibrant artworks that celebrate the beauty of our native plants and wildlife.
Malvern-Valley-Mural-North
Malvern-Valley-Mural-North2
Malvern-Valley-Mural-South
Malvern-Valley-Mural-South2
High quality paving throughout the precinct.
New footpath extensions for extra pedestrian 'plaza' space and outdoor dining.
New seating, bike racks and bins.
Upgraded drainage.
Six (6) new trees plus ground plantings.
Removal of two (2) small trees to improve pedestrian access.
Changes to traffic direction to improve safety.
Solar bollard feature lighting.
Please note: the increase in pedestrian space requires the removal of seven (7) car parking bays.
Consultation on the draft concept for design was completed in December 2020.
The final concept design has been developed and construction will begin in 2021.
For details on the consultation process visit Connect Stonnington.
Download Malvern Valley Streetscape improvement - design(PDF, 9MB)